High COD wastewater treatment

High COD wastewater mainly comes from the chemical industry, which takes animportant position in national economy as a traditional industry. However, withthe development of the chemical industry, the ecological environment isseverely blighted. The COD produced in the chemical wastewater has highconcentration, great toxicity and poor biodegradability and cannot reach theexpected result through common treatment processes. 

Common treatment processes include: physic-chemical method, biologicalanaerobic method, and biological method 


Customer Project Case:100T/D

Parameter

Value

Unit

PH

7

 

CODcr

30000-35000

Mg/l

SS

-

Mg/l

NH3-N

15

Mg/l

TN

25

Mg/l

TP

5

Mg/l

Electrical conductivity

76.2

Ms/cm

Salinity

12-14%

 

 

As the wastewater produced in the production process has high salinity, itshall be desalted first. The cooling water shall be treated by the biochemicalpool and subsequent treatment before discharging. The treated wastewater canreach the level 1 direct discharging requirement of Integrated WastewaterDischarge Standard in Shandong Peninsula Basin or the acceptance requirementsof sewage treatment plant. 

Outgoing water quality 

Parameter

Value

Unit

Reference standard

PH

6-9

 

DB37/676-2007

CODcr

60

Mg/l

SS

20

Mg/l

Chromaticity

40

Mg/l

PH

6-9

 

Acceptance standard of sewage plant

CODcr

850

Mg/l

BOD

300

Mg/l

Salinity

2000

Mg/l

 

Advantages

 1.Technical idea

 a.plan ascustomers requirements,discuss all details with you.

 b.Industry intelligentize, exquisiteworkmanship.

c .All system solution based on the test data inthe Lab.

2.Technology team

 a.High technology enterprise,one third research staff

 b.The research team lead by professor with 30 years experience inenvironment industry
 c.senior engineer team has 5 processing engineers,6 structuralengineers,10 equipment engineers,6 welding engineers.They all have plentyexperience in large project

3.Hardware equipment

 a.Processing equipment import from Europe with high working accuracy

 b.We have auto-welding machine from Germany

 c.Normalize workshop the area reach 1000 square meter

4.Materials and components 

 a.We havecooperation with DOW,electropure,真钱赌球网-线上赌球网站-线上赌球平台:SchneiderSiemensGE,grundfosnanfangpump etc.

 b.we use the best quality stainless steel for the machine

 c.Life span can reach 5-10 years

5.After sale services

 a.One year guarantee,whole life maintenance
 b.24 hours service line